- 浴袍終於解決了,謝謝b T_T
- 今日6pm返office居然就撞到老闆,呵呵。努力的我
- 原來9月2日可以見證小sue小學上學日
- 謝謝媽媽幫忙plan了holiday house
- 今日去yj開會,多謝有同事帶我一起去,否則一定迷路
- 今日去開會其實有d奇怪,不過冇嘅,現場聽一定會好d。
- 下星期就開始training啦~
- 高興自己琴日reject咗個printer打印機deal,否則一定好麻煩
- 新post都ok,好認真寫架~~~
Author: impromptuz
Gratitude Journal 20240827
- 今日早起成功yeahhh,唔簡單
- 突然瘋狂投流,過千讚了。不過again啦都係double-edged sword
- 今日叫popeyes來了一隻小雞翅,ok本來就唔想食咁多
- 今日有食到麥皮,乖
- 今日開會都講咗幾多嘢
- 突然記起「猜不透」,幾好聽
- 今日老闆飛機delay 3小時最後冇返到office,ok good。
- 今次industry又幾好睇,開心
- 今日同m同lift,尷尬到1萬。係唔係一個indication?
Gratitude Journal 20240826
- 開心有t!!!
- 今日終於開始咗做GFA summary先,開始是成功之母
- 嚟緊幾日都有約人 and 有重要的meeting,強迫自己準時
- 決定唔去廣州都係一個好選擇
- 今日有食麥皮!
- threads真係幾好笑lol
- 可以係office拿鑰匙,非常好~
Building Components

main beam, secondary beam, column, slab (notice the span to hold compression and tension) , vs wind load, gravity load
horizontal members, vertical members
foundation/footing
slab-on-grade foundation (grade level = ground level)
HK commonly use reinforced concrete
substructure 底層結構工程 (below ground)
plinth 底座 (in between)
superstructure 上蓋工程 (visible part above ground)
site formation works 工地平整工程 (Site formation works are performed to prepare a construction site for subsequent works for foundation and superstructure. They generally involve the clearance of construction site, demolition of existing structures, excavation to the design formation and/or basement level, reduction and stabilisation of existing slopes, and associated infrastructure works (which include construction of road, drainage, sewage and water works)
foundation works 地基工程
Excavation 挖掘
piling works 打樁工程
demotion works 清拆工程
staircase, lifts, internal walls
bathroom with sunken slab to prevent leakage
balcony with floor level difference to prevent overflow
AC platform with louver
Fire services (hydrant, hose reel, sprinker, bell, fire extenguisher, e-light)
transformer rooms, water tanks
rooftop: life machine room, lightning, HVAC chiller (air inlet, FS inlet, towngas inlet)
residential framing plan
AHU room (air handling unit / Air inlet) – is the heart of central air conditioning. It collects outside air and room air, removes dust and other particles from the collected air, adjusts the temperature and humidity and then supplies comfortable and refreshing air-conditioned air into the rooms through ducts. Indoor air quality
HVAC (heating, ventilating and air conditioning system) – complete system
Slabs are horizontal surfaces, columns are vertical supports, and beams are horizontal members that bridge the space between columns. Together, they create a stable framework for buildings, ensuring that loads are effectively transferred to the ground.
- Design Codes and Standards
- Load Considerations = dead load (self-weight of the members), live load (movable) depends on occupancy, seismic load and wind load depends on height
- Framing system need to coordinate with architectural and MEP mechanical, electrical and plumbing
- Structural Modeling
Gratitude Journal 20240822
- 今日終於send咗個monthly report出去,麻煩唔好reply謝謝。
- 都係唔去廣州了。。valuation budget應該會慘死。好彩未買機票or 約INED
- 每日食少少麥皮🤏 ,罪惡感拉低
- 最近寫post真係寫到好煩厭。我覺得有d變質了,冇咩好內容去分享了~it’s fine。呢d錢唔賺我都ok嘅
- 今日可以食酒店中菜,好食呀!
- 買到33張房卡好開心呀~~
- 呢幾日老闆唔係度都係輕鬆mode,但elephant in the room係valuation budget
- 有時過份重視d人嘅comment,come on~唔好放額外情緒呀。🙅
- 幾時先會繼續睇「論中國」?😂😂
- 最近uniqlo買件衫又幾好睇
- 咁快就9月了。。what!!